Date: 24 October 2019
The Penang Bridge (First Bridge) will be closed from 12:01midnight till 10:00am on 24 November 2019.
The Sultan Abdul Halim Mu’adzam Shah Bridge (Second Bridge) will be operating as usual on 24 November 2019.
Date: 24 October 2019
The Penang Bridge (First Bridge) will be closed from 12:01midnight till 10:00am on 24 November 2019.
The Sultan Abdul Halim Mu’adzam Shah Bridge (Second Bridge) will be operating as usual on 24 November 2019.